Checklist modification and retrofitting
E Checklist modification and retrofitting
Checklist
Run.
No.
Requirement fulfilled Notes
5 Modification and retrofitting yes no
5.1 Is the modification/retrofitting compatible? Are the
requirements of the checklists of planning, installation,
commissioning and validation further fulfilled?
⮫
‘Checklist planning’...page 215
⮫‘Checklist installation’...page 216
⮫‘Checklist commissioning, parametrization and vali-
dation’...page 217
5.2 Was the safety component to be replaced exchanged
for a compatible safety component?
5.3 If non-safety components are changed, is the
checksum unchanged?
5.4 Was the correct security project loaded?
5.5 Are the calculated reaction times further kept after mod-
ification/retrofitting? Proof necessary!
5.6 Were the project data copied on a memory card?
5.7 Was a complete functional test accomplished and docu-
mented?
Date:.........................Name: ...................................Sign: ......................................................