Mechanical installation
63
Joining the shipping splits
All necessary materials for connecting the shipping splits together are located in the
joining cubicle. Join the shipping splits in the following order.
Preparing the liquid pipe connections
Slide Axilock connectors onto the liquid pipes. Note: when the cabinets are pushed
together the pipe ends come too close to each other and the connectors cannot be
installed any more.
Fastening the cabinets together
Two shipping splits are joined in a joining cubicle. Special M6 screws for fastening
the shipping splits together are enclosed in a plastic bag inside the cabinet. The
threaded bushings are already mounted on the post.
Fasten the front post and the rear post of the joining section with 7 screws to the
posts of the next cubicle.
Maximum tightening torque: 5 N·m
(3 lbf·ft)
7× 7×