EasyManua.ls Logo

ABB CRB 1300 - Page 269

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2000001644
Remove the screws and washers.5
xx2000001645
Carefully lift out the motor.6
Removing the axis-1 gearbox
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
CAUTION
Removing gearboxes will release axes. This
means the axes can fall down.
Make sure axes are well supported before remov-
ing gearboxes.
2
xx2000001694
Remove the screws.3
Continues on next page
Product manual - CRB 1300 269
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.4.1 Replacing the base
Continued

Table of Contents

Related product manuals