EasyManua.ls Logo

ABB CRB 1300 - Page 654

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Route the cable package through the lower arm
support and up into the housing.
CAUTION
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
2
Routing the cable package in the housing
NoteAction
Plastic cable protector, axis 4:Slip the axis-4 cable protector over the cable
package.
1
3HAC064694-001:
xx2000001570
xx2000001571
Insert the cable package through the hollow tube
of the axis-4 gearbox, into the extender unit (only
for CRB 1300-7/1.4 and ) and into the tubular.
Make sure that:
the air hoses are facing the axis-3 gearbox
side in the hollow tube of axis-4 gearbox.
CAUTION
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
2
Securing the cable package in the housing
NoteAction
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the axis-4 cable protector.1
Tightening torque: 2.6 Nm
xx2000001546
Continues on next page
654 Product manual - CRB 1300
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.7.4 Replacing the axis-4 gearbox
Continued

Table of Contents

Related product manuals