EasyManua.ls Logo

ABB RER670 - Page 69

ABB RER670
506 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IL1
TRM_40.CH1(I)
UL1
TRM_40.CH7(U)
BOM_4.BO1
BOM_4.BO2
SMAI1
BLOCK
G1AI2P
O:1IT:3II:1
G1N
GRP1L1 G1AI1
GRP1L2 G1AI2
GRP1L1L2 G1AI3
GRP1N
G1AI4
SMAI2
O:1IT:3II:2
BLOCK
GRP2L1
GRP2L1L2
GRP2N
GRP2L2
G2AI2P
G2N
G2AI1
G2AI2
G2AI3
G2AI4
I2P
U2P
BLOCK
BLKZ
BLKZ1
BLKZ2
BLKZ3
TRIP
TRZ1
TRZ2
TRZ3
STA RT
STZ1
STZ2
STZ3
O:920IT:3II:1
ZGTPDIS
Trip
Logic
IEC17000111-1-en.vsd
IEC17000111 V1 EN-US
Figure 21: Typical configuration for single-phase railway supply system
In order to make IED work for single phase power system, the following steps to
be performed (see Figure
21):
1.
Connect IL1 current to the first and third inputs of the SMAI function block.
Set CT ratio for this analogue input accordingly (e.g. 300A/1A).
2.
Connect UL1 voltage to the first and third inputs of the SMAI function block.
Set VT ratio for this analogue input accordingly (e.g. 25kV/100V).
When such configuration is made within ACT tool using only two available
analogue input signals (i.e. UL1 and IL1), the preprocessing block will perform the
following:
Quantities for the first phase (i.e. UL1 and IL1) will be directly measured from
the TRM
Quantities for the second phase (i.e. UL2 and IL2) will be forced to zero value
Phase-to-phase values (i.e. UL1L2 and IL1L2 ) will be directly measured from
the TRM but they will have identical values as quantities for the first phase
Positive sequence quantities (i.e. U1 and I1 ) will be forced to zero
unconditionally
Zero sequence quantities (i.e. 2Uo and 2Io ) will be forced to zero
unconditionally
Note that in such installations, distance or under-impedance protection can only use
L1-L2 measurement loop which will then effectively measure impedance Z=UL1/
IL1. The directional overcurrent protection can also be used. Directional and non-
directional earth fault overcurrent protections and residual overvoltage protection
shall not be used in such installations. All other backup protection and
measurement functions can be used.
1MRK 506 375-UEN A Section 4
Analog inputs
Railway application RER670 2.2 IEC 63
Application manual

Table of Contents