EasyManuals Logo

Agilent Technologies Infinity II 1290 User Manual

Agilent Technologies Infinity II 1290
234 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #101 background imageLoading...
Page #101 background image
Agilent 1290 Infinity II Flexible Pump User Manual 101
Maintenance
7
Replace the Multi-Channel Gradient Valve (MCGV)
4
Disconnect the MCGV cable (1), unscrew the two screws
(2, 3) and remove the valve.
5 Place the new MCGV into position.
NOTE
Make sure that channel A of the MCGV is put at the
bottom-right position.
6
Tighten the two screws (1, 2) and connect the cable to its
connector (3).
7 Install the MCGV cover.
Next Steps:
8 Install the inlet weaver, see “Replace the Inlet Weaver” on page 90.
9 Reconnect solvent tubes for channels A-D from the MCGV to the degasser outlets.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies Infinity II 1290 and is the answer not in the manual?

Agilent Technologies Infinity II 1290 Specifications

General IconGeneral
BrandAgilent Technologies
ModelInfinity II 1290
CategoryWater Pump
LanguageEnglish

Related product manuals