Agilent 1290 Infinity II Flexible Pump User Manual 81
Maintenance
7
Introduction to Maintenance
Introduction to Maintenance
Figure 10 on page 81 shows the main user- accessible assemblies of the
Agilent 1290 Infinity II Flexible Pump. These parts can be accessed from
the front (simple repairs) and don’t require to remove the pump from the
system stack.
Figure 10 Overview of maintenance parts
Recommended Interval for Preventive Maintenance
The recommended interval for preventive maintenance is:
• 100 L or 1 year (whichever comes first).
This recommendation is valid for LC instruments on which “typical”
applications are running.
A “typical” application can be characterized as follows:
• pressure range 100 – 800 bar,
• flow rates 0.5 – 3.5 mL/min,
• typical solvents used in reversed phase LC.
HZVaLVh]HZchdg
HZVaLVh]Ejbe
?ZiLZVkZgdei^dcVa
Bjai^"8]VccZa
<gVY^ZciKVakZB8<K
>caZiLZVkZg
Ejbe=ZVY6hhZbWan
Bjai^EjgedhZKVakZ
EgZhhjgZHZchdg
;^aiZg=djh^c\
=^\]EgZhhjgZ
9Z\VhhZg
>ca^cZ;^aiZg