EasyManua.ls Logo

Agilent Technologies Infinity II 1290

Agilent Technologies Infinity II 1290
234 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Agilent 1290 Infinity II Flexible Pump User Manual 35
Using the Pump
3
Best Practices
Best Practices
Daily / Weekly tasks
Daily tasks
Replace mobile phase based on water/buffer.
Replace organic mobile phase latest every 2nd day.
Check seal wash solvent.
Run conditioning with composition of your application.
Weekly tasks
Change seal wash solvent (10 % / 90 % isopropanol/water) and bottle.
Flush all channels with water to remove salt deposits.
Visually inspect solvent filters. Clean or exchange if necessary.
Power up / Shut-down the pump
Power up the pump
Use new or different mobile phase (as required).
Purge pump heads with 2.5 – 3 mL/min for 5 min.
Condition pump heads for 10 – 20 min.
Long-term shut-down of the pump
Flush system with water to remove buffer.
Use recommended solvents to store the system.
Power off the pump or system.

Table of Contents

Related product manuals