EasyManua.ls Logo

AKYAPAK AHS - Installation Information

AKYAPAK AHS
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A: Akçalar Sanayi Bölgesi Sanayi Cad.
No: 8/A 16225 Akçalar BURSA / TURKEY
T: +90 224 280 75 00
F: +90 224 280 75 01
E: info@akyapak.com.tr
W: akyapak.com.tr
Page: 33/94
AKYAPAK-AHS-UserManual-2019.03.11
POINTS TO BE CONSIDERED IN OPERATION
Points to be considered to prevent risks
If you observe any abnormal condition on the machine, press the “Emergency Stop” button
to turn off the power on the machine.
Correct the abnormal condition by operating manually, then activate automatic operation
when all moving parts are in place.
If one person is responsible for machine operation, other persons shall not operate the
machine.
Do not remove and install tools and perform settings on any part before the machine stops.
POINTS TO BE CONSIDERED IN DAILY OPERATION
Machine maintenance shall be performed by staff responsible for this task.
Do not alter hydraulic pressure settings.
Ensure that moving parts working with each other are centrally lubricated and
specified lubricant is always available in central lubrication reservoir.
Protect operating lubricant against dust and dirt.
WARNING
Wrong movements of electromagnetic valve are 70% caused by the mismanagement
of operating lubricant.
As a result, operating lubricant shall always be clean.
Ensure that all operations on the machine are completed before starting the
machine.
Check the following points individually during inspection.
Is the pressure set correctly?
Is the setting of any individual part performed correctly?

Table of Contents

Related product manuals