Installation Procedures: 17" Panels
62
Modero VG Series Touch Panels - Instruction Manual
10. Remove any necessary wiring knockouts from the (optional) conduit box (CB-TP17) (FIG. 55) where the necessary cables are
threaded through for connection to the touch panel.
11. Thread the incoming RJ-45, Ethernet, and any other audio/video wiring through the knockouts (use of the top or bottom
knockouts are recommended with this installation). Refer to the Wiring Guidelines for the 1700VG Panels section on page 70 for
pinout descriptions. Leave enough slack in the wiring to accommodate any re-positioning of the panel.
12. Install the drywall/sheetrock before inserting the main NXD unit into the CB-TP17.
FIG. 55
Screw locations for conduit box attachment in a pre-wall installation
Notched stud
Knockouts should be located on
Inserted block bridges the gap
Stud fastening holes
Mounting tabs for
NXD Wall Mount panel
Use four #8 flat-head
should be flush
with the outside
Stud
of the sheetrock
Mounting Screws to secure
the NXD to the CB
Conduit Box can be
fastened to both
studs)
between the Conduit Box and
the notched beam
Secure Beam to block
Depth depends on the
thickness of the Drywall
Drywall/sheetrock
the left-side of the conduit box,
alongside the connectors