PU-4010 2-1
Chapter 2 Measurement
Before testing samples, review the following flowchart for an overview of the test procedure.
2-1 Operation Flow Chart
Turning on the power Page 2-4
Test conditions setup
• Selecting test strip type Page 2-5
• Setting measurement number Page 2-6
• Setting patient ID Page 2-7
Preparing samples Page 2-9
Preparing test strips Page 2-9
Testing samples Page 2-10
• Press button.
• Dip the test strip in the sample.
• Remove excess urine from the test strip.
• Place the test strip on the test strip holder.
• The instrument reads the test strip.
• The result is reported on the display and printout.
When the test is complete
• Dispose of the used test strip.
After the final measurement of the day
• Daily cleaning:
Test strip holder, holder base and guide rails Page 4-1
• Turning off the power Page 2-4
To the next
sample
measurement