Field Service Manual December 2003
Page 273 of 276
Installation phase
Installation machine – connection developer
Leveling the SW8xx
Carriage must be positioned in the middle of granit and air bags must be
inflated(do not forget to connect the air pressure coupling on the bottom
side of the air bags). Leveler can be positioned at the outside corners of the
granit at the side where the carriage hovers over the granit. Machine must be
leveled in X and Y direction. Leveling must be done by adjusting the four feet
of the machine.
Leveling instrument accuracy : 0.01mm/m for one devision.
Keep the bubble within 2 devisions.
Testing the filmfeeder
Filmfeed parameter setting
Vacuumsettings + detections !
Checking freq and delay
Resource files setting
Adjusting the filmdensity for each resolution
Checking the linewidth for each resolution
Accuracy
Connection Ucam - PowerRip
Complete queue of customerjobs
Tools for Customer Care Engineers
ASS/OPTICS300 TOOLKIT G232940
CA: CA.+DIODE RDADC->LIMC G199270
GLASSES OPTICS 100/300/600 W382314
J BNC AD F- 2 BANANAS G103090
Microscope (150X) Model PEAK
http://www.schut.com
Multimeter(measuring micro-amps) FLUKE 183+carrying bag C90
http://www.fluke.com
Densitometer
http://www.techkon.com TECHKON
http://www.viptronic.com/p1000_uk.html VIPDENS 130
Note: All parts have to be ordered.