As-Needed/As-Required Maintenance
Replacing the Chloride Electrode Tip
UniCel DxC Systems Instructions For Use A13914 Maintenance
October 2005 Page 10-69
10
Replacing the Chloride Electrode
3 To prevent reagent leakage from the flow cell, select:
• the Utils icon from the menu bar,
• <2> Maintenance,
• <3> ISE Service,
• <Continue>.
The flow cell is prepared for electrode maintenance.
4 Proceed to Replacing the Chloride Electrode below.
CAUTION
To prevent damage due to electrical static discharge (ESD), wear the wrist
ground strap when performing this procedure. For further instructions, refer
to "Basic Laboratory Practice
" in the beginning of this chapter.
Step Action, continued
(2 of 2)