68 Brocade DCX 8510-4 Backbone Hardware Reference Manual
53-1002177-06
Control processor blade (CP8) removal and replacement
5
a. Run the haFailover command to make the standby CP blade the active blade. The currently
active CP blade becomes the standby blade. Wait until the status LED on the currently
active CP blade is no longer lit.
b. Confirm the completion of the failover by running the haShow command.
c. Log in to the new active CP blade.
7. Ru n firmwareShow to note the firmware version of the active CP blade.
The following example shows the results of the firmwareshow command when the firmware
versions on the two CP blades are not the same. Note the warning message at the end of the
output.
DCX_120:root> firmwareshow
Slot Name Appl Primary/Secondary Versions Status
--------------------------------------------------------------------------
4 CP0 FOS v6.4.0a STANDBY
v6.4.0a
5 CP1 FOS v7.0.0 ACTIVE *
v7.0.0
WARNING: The local CP and remote CP have different versions
of firmware, please retry firmwaredownload command.
DCX_120:root>
8. Run haDisable from the active CP blade to prevent failover or communication between the CP
blades during the replacement.
9. Use the configUpload command to upload the backbone configuration to a specified FTP
server. Enter information at the prompts.
a. Run the fosconfig --show command to determine if virtual fabrics are enabled. If so, run
the configupload -vf command. This command uploads the Brocade DCX 8510-4 virtual
fabric data.
b. If virtual fabrics are not enabled, run the configupload command. This command uploads
the Brocade DCX 8510-4 configuration.
Removing a control processor blade (CP8)
For this procedure, please refer to “ESD precautions” and Figure 22.
The chassis continues to operate while a CP blade is being replaced if the redundant CP blade is
active and a failover does not occur. You can prevent failover by entering the haDisable command.
Complete the following steps to remove a CP8 control blade (CP).
1. Remove the chassis door.
2. Log in to the active CP as the admin user. You can use a serial cable or Telnet, Web Tools, or
Fabric Manager. Determine which CP is active using the haShow command or view the active
LED on the front of the CP.
3. If the faulty CP is the active CP, issue the haFailover command. Wait until the failover has
completed. Use the haShow command to verify the CPs are synchronized and the failover is
complete.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Brocade Communications Systems DCX 8510-4 and is the answer not in the manual?

Brocade Communications Systems DCX 8510-4 Specifications

General IconGeneral
BrandBrocade Communications Systems
ModelDCX 8510-4
CategorySwitch
LanguageEnglish

Related product manuals