EasyManua.ls Logo

BRP SUMMIT - Page 242

BRP SUMMIT
502 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 05 ENGINE MANAGEMENT (POWER TEK)
Subsection 03 (COMPONENT INSPECTION, REPLACEMENT AND ADJUSTMENT)
DESS Post Verification Tether
Cord Cap Removed
Connect test probes to switch BLACK/GREEN and
BLACK/WHITE wires. Measure resistance, there
should be NO continuity (open circuit).
Connect one test probe to the WHITE/GREY wire
and the other test probe to the switch top termi-
nal. Measure resistance, it must be close to 0
ohm.
Connect one test probe to the BLACK/GREEN
wire and the other test probe to the switch ring.
Measure resistance, it must be close to 0 ohm.
DESS Post Verification Tether
Cord Cap on DESS Post
Connect test probes to switch BLACK/GREEN
and BLACK/WHITE wires. Measure resistance, it
must be close to 0 ohm.
mmr2005-107 229

Table of Contents

Related product manuals