EasyManua.ls Logo

CASE CONSTRUCTION CX17C - Page 212

CASE CONSTRUCTION CX17C
240 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-ACCESSORIES
Operationwiththehydraulicauger
Thehydraulicaugerisadouble-actinghydraulicattachment,andshallbeconnectedtotherstauxiliary(2-way)
hydrauliccircuit.
Therefore,tooperatewithahydraulicaugerthemachineshallbeequippedwiththerstauxiliary(2-way)hydraulic
circuit.
Aftermakingsuretohavereadandunderstoodthe
installationproceduredescribedintheOperator’smanual
oftheattachmentproceedasfollows:
1.Makesurethatthemachineandtheattachmenttobe
installedareonatandlevelground.
2.Operatethecontrolsofboom,armandbucketinorder
toinstallthehydraulicaugerwithitsrelativecradleand
powerheadunitaugerdrivetothebucketlinkageat
thetopofthearm.
3.Stoptheengine.Releasepressureinsidetherstaux-
iliary(1-way)hydrauliccircuitasindicatedonpage
6-10.
4.Openthesidehoodtoaccesstothethree-wayvalve.
Useawrenchtoturntheboltofthethree-wayvalve
andpositioningittothetwowayow,doubleacting
hydrauliccircuit.
Closethesidehood.
5.Closethestopvalvesatthetopofthearm.Install
theconnectinghosesbetweentheattachmentandthe
stopvalves.
NOTICE:onthepowerheadunitaugerdrive,make
suretoidentifythesupplyport(INorP)andthere-
turnporttotank(OUTorT).Thehoseforpowerhead
unitaugerdrivesupplyshallalwaysbeconnectedto
thestopvalveontheleft-handsideofthearm.Ifthe
supplyportonthepowerheadunitaugerdriveisnot
alignedtothestopvalveontheleft-handsideofthe
arm,checkforanalternativesetupofthehydraulic
portsontheattachment.
NOTICE:alwayskeepeachconnectinghoseonthe
samesideofthearm.Nevercross-overtheconnect-
inghosesbetweenthetwosidesofthearm.
6.Openthestopvalvesandcheckthexingclampsfor
looseness,andthetubesandhosesttingsforleak-
ages.
9-12

Table of Contents

Related product manuals