116
ENGINE
CHECKING THE VALVE TIMING
Engine: RFJ
Tools.
[1] Camshaft pinion peg : (-).0194.A
[2] Crankshaft setting peg : (-).0189.R
[3] Engine lifting crossmember
Removing.
Disconnect the battery negative terminal.
Raise and support the vehicle, front wheels hanging.
Remove:
- The front RH wheel
- The plastic pins holding the splash-shield (press on the central axis to release them).
- The splash-shield.
A: Pegging on the manual gearbox.
B: Pegging on the automatic gearbox.
Turn the engine by means of the crankshaft pinion screw, to bring it to the pegging position.
Peg the crankshaft, using the peg [2].
Position tool [3].
Suspend the engine.
Remove:
- The RH engine support.
- The upper timing cover.
B1BP2V3D
C5
Angl.T3-page032-190-2005 4/02/05 15:15 Page 116