200
INJECTION
CHECKING THE AIR SUPPLY CIRCUIT
Engines: RHL - RHR
Checking the warm air opening.
Remove:
- The air duct (4).
- The air duct (5).
- The air duct (6).
Connect the tool [1] on the warm air butterfly control diaphragm at «e».
Apply a vacuum of 0,7 ± 0,2, the warm air butterfly «f» should be fully open.
Checking the cold air closing.
Connect the tool [1] on the cold air butterfly control diaphragm at «g».
Apply a vacuum of 0,65 ± 0,2, the cold air butterfly «h» should be fully closed.
Refit:
- The air duct (4).
- The air duct (5).
- The air duct (6).
B1BP344C
C5
B1BP345C
B1BP343C
Angl.T3-page191-206-2005 4/02/05 15:05 Page 200