EasyManua.ls Logo

CITROEN C5 2005 - Page 173

CITROEN C5 2005
355 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
169
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHL - RHR
Remove:
- The screw (8) and the auxiliaries drive pulley (7).
- The crankshaft position sensor (11).
- The lower timing cover (9).
- The target of the crankshaft position sensor (10), using tool [7].
- The lower torque reaction rod.
- The tool [6].
Slacken the screw (12) of the tensioner roller (17).
Remove the timing belt (13).
Checks.
IMPERATIVE: Just before refitting, carry out the checks below.
Check:
- That the rollers (14) and (17) turn freely (without play and without any tight spot).
- That the coolant pump pulley (16) turns freely (without play and without any tight spot).
- That there are no signs of oil leaks from the crankshaft and camshaft seals, etc.
- That the crankshaft pinion travels freely on the keyway (15).
Replace defective components if necessary.
B1EP1FCC
B1EP1FDC
B1EP1FEC
C5
Angl.T3-page032-190-2005 4/02/05 15:15 Page 169

Table of Contents

Related product manuals