EasyManua.ls Logo

CITROEN C5 2005 - Page 177

CITROEN C5 2005
355 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
173
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHL - RHR
B1EP1FLC
Refit tool [6].
Remove the auxiliaries drive pulley (7).
Refit the crankshaft position sensor target (10), the lower timing cover (9), the crankshaft position sensor (11),
the torque reaction rod on the lower engine support.
Take away the workshop hoist.
Coat the screw (8) with Loctite FRENETANCH.
Refit the auxiliaries drive pulley (7) and the screw (8) with its washer.
Tighten the screw (8) to 7 ± 0,7 m.daN, then angular tighten by A = 60° ± 5°.
Remove tools [2], [3] and [6].
Refit the upper timing cover (6).
Reposition the electrical harness (5).
Refit the RH engine support (4), the torque reaction rod (3).
Reclip the fuel supply and return pipes.
Connect the fuel supply pipe (1), the fuel return pipe (2).
Refit:
- The auxiliaries drive belt (see corresponding operation).
Complete the refitting.
C5
Angl.T3-page032-190-2005 4/02/05 15:15 Page 173

Table of Contents

Related product manuals