DANGER : ELECTRICAL HAZARD!!
- Ensure DC and AC cables are always de-energized during De-commissioning
to avoid Shock Hazard!
5.4 De-Commissioning
The procedure to de-commission:
1. Follow Section 5.1.1 to disconnect from the grid.
2. Follow Section 5.1.2 to open the door.
3. Remove communication, DC, AC and Internal PE cables from terminals.
4. Put stopper into the each hole of inner rubber and fasten well for sealing.
- The surface of the inverter may be hot to cause injury, ensure the temperature
is in the proper range before De-commissioning.
CAUTION : HOT SURFACES
- All cable conductors have to seal well with high insulation material.
ATTENTION
72