EasyManua.ls Logo

Dover HEIL Command-SST - Page 145

Dover HEIL Command-SST
272 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issued June 2020
Maintenance
Copyright 2020, Heil Environmental
Printed in U.S.A.
135
*HOURS OF OPERATION * Daily = 8 hrs. Weekly = 40 hrs. Monthly = 200 hrs. 6 Months = 1000 hrs. Yearly = 2000 hrs.
COMPONENT/SYSTEM
8
40
200
1000
2000
CHECK/SERVICE
Operator Controls
Front Mount Pump or Power Take-Off
(PTO)
Check seals for leaks and operation.
Replace if necessary
Check drive line for smooth operation.
Replace as necessary.
Check set screws for tightness.
Tighten as necessary.
Make sure keys are in place.
Replace if necessary.
For greaseable PTOs (non-wet spline),
remove the pump’s bolt flange about 2
inches from the PTO and apply grease to
female pilot of PTO pump flange. Failure to
lubricate female pilot of PTO as given may
cause damage to the pump shaft. Greasing
is NOT required on wet spline PTOs such
as the Chelsea 890/897 series.
Grease Fittings
Lubricate as shown on Body and Loader
Lubrication Guides.
Body Undercoating
Inspect body undercoating and repair as
necessary.
Tailgate Seal Integrity
Check tailgate seal integrity and replace as
necessary.
Packer/Ejector Cylinder Preventive
Maintenance
See Packer/Ejector Cylinder Preventive
Maintenance
Packer/Ejector Panel Bolt-in Cylinder
Mount Bolts
Check for tightness. Bolt torques should be
192 Ft-Lbs. (lubricated threads)
140
137

Table of Contents