EasyManua.ls Logo

Dover HEIL Command-SST - Loader Preventive Maintenance Chart; Loader Lubrication Guide

Dover HEIL Command-SST
272 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issued June 2020
Maintenance
Copyright 2020, Heil Environmental
Printed in U.S.A.
139
LOADER PREVENTIVE MAINTENANCE CHART
Maintenance performed on a regular schedule is preventive maintenance. Normal maintenance intervals are based on an
8-hour day and average operating conditions. Severe use or adverse conditions make it necessary to do this maintenance
more frequently.
REF NO.
ACTIVITY
INTERVAL
SERVICE/CHECK
1
Grease Lift
Weekly
(40 hrs)
See the Loader Lubrication Guide or the lubrication
decal on the lift arm.
2
Hydraulic Plumbing
Weekly
(40 hrs)
Check for damage, worn, or leaking hoses, tubes or
fittings. Replace as necessary. NOTE: Do not replace
steel tubes with hoses.
3
Check Lift Body Mount
Base Bolts
Weekly
(40 hrs)
Inspect the bolts clamping the arm to the main pivot boss
for looseness or damage. Replace if damaged.
4
Grabber Assembly with Belt
Weekly
(40 hrs)
Inspect belt condition for wear, cuts or damage. Replace
if present.
5
Hoses
Weekly
(40 hrs)
Check for tears, wear or holes. Replace if present.
6
Loader Main Arm Pivot
Monthly
(200 hrs)
Inspect for damage/wear. Replace if present.
7
Loader Arm Wear Pads
Monthly
(200 hrs)
Check wear pads for excessive wear. Replace if present.
See Loader Arm Wear Pads for acceptable wear
values.
140
142

Table of Contents