EasyManua.ls Logo

Extreme Networks BlackDiamond 8810 - Page 86

Extreme Networks BlackDiamond 8810
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the BlackDiamond 8800 Series Chassis
BlackDiamond 8800 Series Switches Hardware Installation Guide
86
6 Carefully lift the BlackDiamond 8806 chassis off the foam cushion and onto the floor (Figure 48).
Figure 48: Correct Method for Lifting the BlackDiamond 8806 Chassis
CAUTION
Do not use the fan tray handle to lift or maneuver the BlackDiamond 8806 chassis. This handle is not
designed to support the weight of the chassis.
Verify that the following items are included in the shipping carton:
BlackDiamond 8806 chassis with four installed blank front panels
Power cord retainer
19-inch support bracket
BlackDiamond documentation pack with ESD-preventive wrist strap
NOTE
Save all packaging, clip locks, and box pieces for future use in the event that the BlackDiamond 8806
chassis must be moved to another location or returned to Extreme Networks, Inc.
EX_112

Table of Contents

Related product manuals