EasyManua.ls Logo

FAAC A1400 AIR - Page 39

FAAC A1400 AIR
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A1400 AIR 39 532129 04 - Rev.B
50
49
1
2
3
2
1
1
3
3
8
7
7
6
1
6
2
7
6
4
Nm
3
8
9
Nm
4
9
Translation of the original instructions
ENGLISH
- 120 - 118 for DOUBLE leaf automations
6. Fasten the lower plate onto the leaf gripper using the 2 screws
50-
7. Lift the leaf until the upper and lower plates of the carriage come
into contact 50-
. The slots must be aligned.
For manual lifting, arrange for an adequate number of people for the
weight of the leaf: 1 person for every 20 kg to be lifted.
!
Use suitable glazing suction cups.
8. Fasten the 2 plates of the carriage together 50-
.
9. Adjust the counter wheel 50-
(see 37).
10. Insert the end cover 50-
.
!
Check leaf verticality.
When the leaf is open or closed, the shoe must be fully inside the lower
leaf profile.
The distance between glass and lower shoe must be 4mm 50-.
!
When installation has been completed, apply the FAAC stickers supplied
with the automatic door to the glass leaves.

Table of Contents

Related product manuals