Contents and general safety instructions
IV
Festo P.BE-CPX-PNIO-E N en 1407c English
2.4 Instructions for commissio ni ng with Siemens SIMATIC STEP 7 2-19...........
2.5 Preparing for commissio ni ng 2-21......................................
2.5.1 Import device master file (GSDML) and symbol files 2-21...........
2.5.2 Select GSDML file (compatibility table) 2-23......................
2.5.3 Setting up automation pro ject 2-24.............................
2.5.4 Setting up the contro l l er system (PLC/Master) 2-25................
2.5.5 Instal l GSDML file 2-27.......................................
2.6 Basic hardware configuration 2-28.....................................
2.6.1 Lo calise and identify CPX termi nal i n the network 2-28..............
2.6.2 Select CPX termi nal (station selection) 2-30......................
2.6.3 Assign “Device Name” 2-33...................................
2.6.4 Set up Prioritized Start-up (“Fast S tart-up ”) 2-35..................
2.6.5 Assigning or changing IP address 2-39..........................
2.6.6 Use MAC addressing 2-42.....................................
2.6.7 Determine port addresses 2-42................................
2.7 CPX-terminal configuration 2-43.......................................
2.7.1 All o cate co nfi gurati o n table (insert bus nodes and modules) 2-43....
2.7.2 Modify I/O address 2-47......................................
2.7.3 Modi fy diagnostics address 2-47...............................
2.8 Parameterisati o n 2-49...............................................
2.8.1 Start parameterisation during switch-o n (system start) 2-51.........
2.8.2 Parameterisatio n of the CPX terminal wi th Si emens STEP 7 2-52......
2.8.3 Parameterisatio n with the operator uni t 2-56.....................
2.8.4 Parameterisation through the Festo Maintenance Tool 2-56..........
2.8.5 Bus node parameters 2-57....................................
2.8.6 Application example for the parameterisation 2-60................
2.9 Identification & Maintenance 2-61......................................
2.10 Configuratio n in the Remote Controller operating mode 2-64................
2.11 Checklist for commissioning the CPX terminal 2-66........................