5. Allow the Calibrator Mainframe reading to stabilize, then record the Calibrator
Mainframe capacitance reading for each nominal value listed in Table 6-40. Compare
the Calibrator Mainframe capacitance readings to the actual capacitance values and
the tolerance column of Table 6-40.
Table 6-40. MeasZ Capacitance Verification
Nominal
Capacitance Value
Calibrator
Mainframe
Capacitance
Reading
Actual Capacitance
Value Tolerance
5 pF 0.75 pF
29 pF 1.95 pF
49 pF 2.95 pF
6-73. Overload Function Verification
This procedure uses the following equipment:
50 feedthrough termination
BNC cable supplied with the Calibrator Mainframe
Refer to Figure 6-14 for setup connections.
5520A-SC600
SC600 Cable
50 Feedthrough
Termination
HI
LO
TRIG
GUARD
TC
20A
1000V
RMS
MAX
20V
RMS
MAX
20V
PK
MAX
1V PK
MAX
SHELLS
NOT
GROUNDED
NORMAL AUX
SCOPE
OUT
V, , ,
RTD
A, -SENSE,
AUX V
150V
PK
MAX
20V
RMS
MAX
20V PK MAX
20V PK MAX
5520A
CALIBRATOR
yg061f.eps
Figure 6-14. Overload Function Verification Setup