EasyManua.ls Logo

Fluke 5520A - Page 78

Fluke 5520A
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5520A
Service Manual
3-22
14. Measure and enter the values into the UUT for calibration steps 14 and 15 in Table 3-
15 as prompted.
15. Disconnect the DMM from the UUT, and connect it to the Guildline 9334H/1G
Resistance Standard. Scale the 1 GΩ DMM range to the Resistance Standard as
described in the HP3458A user documentation.
16. Connect the UUT to the DMM in a 2-wire ohms configuration as shown in
Figure 3-12.
17. Measure and enter the value into the UUT for calibration step 16 in Table 3-15 as
prompted.
18. Verify that the UUT is in Standby and disconnect the test equipment.
Table 3-15. Calibration Steps for Resistance
Step 5520A Output (4-Wire Ohms, NORMAL and AUX)
1 1.0000 Ω
2 11.0000 Ω
3 110.0000 Ω
4 0.350000 kΩ
5 1.100000 kΩ
6 3.50000 kΩ
7 11.00000 kΩ
8 35.0000 kΩ
2-Wire Ohms, NORMAL
9 110.0000 kΩ
10 0.350000 MΩ
11 1.100000 MΩ
12 3.50000 MΩ
13 11.00000 MΩ
14 35.0000 MΩ
15 110.000 MΩ
16 400.00 MΩ

Table of Contents