EasyManua.ls Logo

Fluke 6270A - Page 125

Fluke 6270A
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pressure Controller/Calibrator
Contamination Prevention System (CPS)
119
10. Inspect to make sure all O-rings are in the correct place prior to re-assembly
(see Figure 50).
The filter retainer has an O-ring on each end.
The filter manifold has 3 O-rings.
The purge tube has one O-ring and a c-clip.
The screen retainer has one O-ring.
The lower housing has one O-ring.
11. Reassemble in reverse order.
hxn032.eps
Figure 50. Pump Inspection

Table of Contents

Other manuals for Fluke 6270A

Related product manuals