EasyManua.ls Logo

Fronius Symo Advanced 10.0-3-M - Data Communication; Permitted Cables for the Data Communication Area; Routing Data Communication Cables

Fronius Symo Advanced 10.0-3-M
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Data communication
Permitted cables
for the data
communication
area
max. 30 m
Unshielded
max. 3 m
Unshielded
max. 30 m
Shielded
max. 30 m
Unshielded
max. 30 m
Unshielded
max. 300 m
Shielded
S0 USB IOs
Solar Net
LAN
Relay
Routing data
communication
cables
IMPORTANT! Operating the inverter with one option card and two broken-out
option card slots is not permitted.
To cater for this eventuality, a suitable blanking cover (item number
42,0405,2094) is available from Fronius as an option.
IMPORTANT! If data communication cables are wired into the inverter, observe
the following points:
-
Depending on the number and cross-section of the data communication
cables that are being introduced, take the relevant blanking plugs out of the
sealing insert and insert the data communication cables.
-
The relevant blanking plugs must be inserted into the free openings on the
sealing insert.
1 2
58

Table of Contents

Other manuals for Fronius Symo Advanced 10.0-3-M

Related product manuals