EasyManua.ls Logo

Fronius TPS/i Robotics TWIN Push - Connect the Interconnecting Hosepacks to the Power Source, Cooling Unit and TWIN Controller

Fronius TPS/i Robotics TWIN Push
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
70
Connect the inter-
connecting hose-
packs to the
power source,
cooling unit and
TWIN Controller
IMPORTANT! When connecting the interconnecting hosepacks, observe marks 1 and 2
on the interconnecting hosepacks and on the power sources:
1 = water-cooled interconnecting hosepack
2 = gas-cooled interconnecting hosepack
NOTE!
If the interconnecting hosepack is laid incorrectly it can have a significant influence
on the welding results, a stable welding process is not guaranteed!
As far as possible, maintain a distance of 30 - 50 cm between the two interconnecting
hosepacks.
Lay interconnecting hosepacks to the power sources
Connect the interconnecting hosepacks to the power sources, cooling units and TWIN
Controller
1
2

Table of Contents

Related product manuals