86
Commissioning
Requirements The following requirements must be fulfilled for commissioning of the wirefeeder:
- All components installed and connected in accordance with the “Installation” section
- All necessary welding media connected to the wirefeeder
- Feed rollers inserted into wirefeeder
- Wire electrode threaded in
- Contact pressure of the feed rollers set
- Motor calibration carried out
- All covers closed, all side pieces installed and all safety devices in good order and in-
stalled in the location intended (for example, protective covers)
Commissioning -
start of welding
When using a TWIN welding process, welding is started by an active welding start signal
from the robot controls.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fronius TPS/i Robotics TWIN Push and is the answer not in the manual?

Fronius TPS/i Robotics TWIN Push Specifications

General IconGeneral
BrandFronius
ModelTPS/i Robotics TWIN Push
CategoryWelding System
LanguageEnglish

Related product manuals