When performing periodical settings like schedule settings for the following functions, perform the setting to all the
indoor units in the same refrigerant system simultaneously, conforming to the timing restriction described below.
<Corresponding function>
More than 10 minutes must elapse
More than 10 minutes must elapse
· Stop operation
· Set indoor unit forced thermostat
off mode
· Start operation
· Release indoor unit forced
thermostat off mode
Forced thermostat OFF instruction, outdoor unit forced off instruction and capacity save setting.
Only one equipment can send these instructions for each refrigerant system.
When these instructions are sent by multiple equipment (eg.from System Controller & BACnet
®
Gateway at the
same time), the system may not respond as instructed or may malfunction.
The electricity charge apportionment function of VRF system can only be performed from one equipment simultaneously.
Therefore, ECA setting, required to be set before performing electricity charge apportionment, can only be sent from one
equipment simultaneously.
The energy saving function of VRF system can only be performed from one equipment simultaneously. Therefore, ES
setting, required to be set before performing energy saving, can only be sent from one equipment simultaneously.
PACKING LIST
Name and shape Quantity Application
DVD-ROM
1
Includes the software and manuals for
BACnet
®
Gateway
.
WibuKey
(Software protection key)
1
Software protection key to be connected to an USB port on the PC
that is
BACnet
®
Gateway is installed
.
BACnet
®
Gateway
runs only on a
PC with this WibuKey.
OTHER REQUIRED DEVICES (FIELD SUPPLIED)
Personal computer that satisfies the following system requirements ●
E ● chelon
®
U10 USB Network Interface – TP/FT-10 Channel (Model number: 75010R) (Required
for each VRF Network.)
PERSONAL COMPUTER SYSTEM REQUIREMENTS
Operating system
• Microsoft
®
Windows
Vista
®
Home Premium (32-bit) SP2,
Windows
Vista
®
Business (32-bit) SP2
• Microsoft
®
Windows
®
7 Home Premium (32-bit or 64-bit) SP1,
Windows
®
7 Professional (32-bit or 64-bit) SP1
• Microsoft
®
Windows
®
8 (32-bit or 64-bit), Windows
®
8 Pro (32-bit or 64-bit)
• Microsoft
®
Windows
®
8.1 (32-bit or 64-bit), Windows
®
8.1 Pro (32-bit or 64-bit)
[Supported languages]
English, Chinese, French, German, Russian, Spanish, and Polish
CPU Intel
®
Core
TM
i3 2 GHz or higher
Memory • 2 GB or more (for Windows Vista
®
and Windows
®
7 [32-bit])
• 4 GB or more (for Windows
®
7 [64-bit], Windows
®
8, and Windows
®
8.1)
HDD 40 GB or more of free space
Display 1024 × 768 or higher resolution
Interface
• Ethernet port (for getting access to the Internet using LAN)
• USB ports (Maximum of 5 ports)
- 1 USB port is required for WibuKey connection
- Maximum of 4 USB ports are required for Echelon
®
U10 USB Network Interface
* Maximum number of required USB ports depends on the applicable system congurations.
Software Adobe
®
Reader
®
9.0 or later
Optical drive DVD-ROM drive
- (05 - 118) -
CONTROL
SYSTEM
CONTROL
SYSTEM