EasyManua.ls Logo

Fujitsu Airstage J-II - Header

Fujitsu Airstage J-II
836 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HEADER3-4.
HEADER INSTALLATION
Header selection
z
Header
3 - 6 Branches 3 - 8 Branches
UTR-H0906L UTR-H0908L
When Separate into two branches, please use a separation tube instead.
Installation
z
(1) When connecting the connection pipes from the indoor units, connect them to the header
branch pipes in order of 1, 2, 3, etc.
1
2
3
4
.
.
.
1
2
3
4
.
.
.
Gas pipe
Liquid pipe
To indoor
unit
To outdoor unit or
separation tube
To outdoor unit or
separation tube
To indoor
unit
(2) Use a pipe cutter to cut at the location that matches the piping size or use expanders as
necessary.
Joint pipe
Connections
Field pipe
Expander
Cut in the center of
the connections
(3) Attach a plugging pipe provided if there is no piping connected at the headers.
Connection pipe
Plugging pipe
- (06 - 37) -
SYSTEM
DESIGN
SYSTEM
DESIGN

Table of Contents

Other manuals for Fujitsu Airstage J-II

Related product manuals