EasyManua.ls Logo

GE auisys cs2

GE auisys cs2
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Turning on the system
1.
Plug the power cord into an electrical outlet. Make sure the
system circuit breaker is on.
The mains indicator is lit when AC power is connected.
Battery is charging if it is not already fully charged.
1
2
AB.91.044
1. System switch
2.
Mains indicator
Figure 3-1 • Mains indicator and system switch
2. Check that the breathing system is properly connected.
Do not turn on the system with the right-hand
(inspiratory) port plugged.
--
3. Turn the System switch to On.
The display shows the power-up screen.
The system does a series of automated self tests.
4. Perform a Full Test before the first case of the day.
5. Perform a preoperative checkout before each case. See the
"Preoperative checkout" section.
The system must perform a power-up self test after 12 hours of
remaining on. If the system has been on longer than 12 hours
without a power-up self test, the ‘Turn power Off and On for self
tests’ alarm occurs. Turn the power off and then back on between
cases to resolve the alarm.
--
CAUTION
Note
3 Operation
2067226-001 3-3

Table of Contents

Related product manuals