Index-2 LOGIQ e – Basic Service Manual
5461614-100 English Rev. 6
environmental dangers, 2-19
environmental specifications for the unit, 2-4
errors, i-12
ESD, 1-31
ESD prevention, 1-32
exam study, display location, 4-20
examine packages, 3-6
F
facility needs, 2-12
desirable features, 2-14
DICOM network function, 2-16
DICOM setup requirements, 2-17
network setup requirements, 2-16
purchaser responsibilities, 2-12
required facility needs, 2-13
suggested floor plan
scanner and EchoPAC in same room, 2-15
floor plan suggestion
scanner and EchoPAC in same room, 2-15
focal zone, display location, 4-20
functional checks, 10-19
mains cable inspection, 10-20
system checks, 10-19
G
GE Healthcare leakage current limits, 10-29
general console requirements, 2-3
generic procedure on probe leakage current, 10-36
grounding continuity, 10-32, 12-32
H
hardware/software compatibility, 9-3
hardware-software
compatibility, 5-3
hot or cold
if the unit is very cold or hot, 2-3
how often should maintenance tasks be performed?,
10-11
human safety, 1-19
I
icons, 1-7
icons indicating a special procedure to be used, 1-10
if the unit is very cold or hot, 2-3
imaging parameters, display location, 4-20
important precautions, i-2
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-3
introduction (chapter 1), 1-1
L
legal notes, i-14
lighting, 2-5
list of abbrevations, 9-2
loading software, 8-13
lockout/tagout (LOTO) requirements, 1-29
log on procedures
defining, 10-7
Logon
Admin screen, 10-7
LOTO
lockout/tagout requirements, 1-29
M
mains cable inspection, 10-20
maintenance
physical inspection, 10-21
preliminary checks, 10-17
system maintenance, 10-17
maintenance task schedule, 10-11
manufacturer, 1-34
mass
with monitor and peripherals, 3-12
Measurement Summary window, display location,
4-20
mechanical safety, 1-22
model designations, 1-7
models covered by this manual, 1-5
N
network setup requirements, 2-16
O
omission and errors, i-12
operational and storage temperature for probes, 2-11
P
P4 Key Function, 7-10
paperwork
after setup, 3-33
PDF files
display and print, 4-15
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-9
phone numbers
customer assistance, 1-34
physical dimensions, 3-12
physical inspection
at arrivel, 3-11
Power On, 3-14
precautions
certified electrical contractor statement, i-11
damage in transport, i-11
important precautions, i-2