Chapter 8 - Replacement Procedures 8-181
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
13.)Fold the excessive cable and use the cable clips to hold it.
14.)Install the following covers: MPB Front Metal Door, Upper Front eTower, Lower Front eTower with
cutout for ECG.
Figure 8-203 Connecting Printer and ECG Cables
• MPB Front Metal Door Installation Procedure
• Lower Front eTower Cover Installation Procedure
• Upper eTower Front Cover Installation Procedure