EasyManua.ls Logo

GE Venue R1

GE Venue R1
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-182 Section 8-8 - Peripherals Replacement/Installation Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-8-5 ECG Replacement Procedure
8-8-5-1 Tools
Appropriate Phillips screwdriver
8-8-5-2 Time Required
15 min
8-8-5-3 Preparations
1.) Shut down the Venue™ ultrasound unit, as described in Power Shut Down .
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-8-5-4 ECG Removal Procedure
1.) Remove the following covers: Lower Front eTower, and Upper Front eTower.
2.) Release the screw that secures the ECG module in place.
FRU Part #
Refer to Table 9-20 on page 9-19.
Lower Front eTower Cover Removal Procedure
Upper eTower Front Cover Removal Procedure
Figure 8-204 Releasing ECG Securing Screw

Table of Contents

Related product manuals