EasyManua.ls Logo

GE Venue R1

GE Venue R1
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 8 - Replacement Procedures 8-183
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
3.) Gently pull out the ECG module.
4.) Disconnect the USB cable and remove the ECG.
8-8-5-5 ECG Installation Procedure
1.) Connect ECG to the USB cable.
2.) Insert the ECG module all the way in.
3.) Tighten the ECG securing screw.
4.) Install the following covers: Upper Front eTower, Lower Front eTower.
Figure 8-205 Pulling Out ECG
Figure 8-206 Removing ECG
Upper eTower Front Cover Installation Procedure
Lower Front eTower Cover Installation Procedure

Table of Contents

Related product manuals