Chapter 8 - Replacement Procedures 8-135
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
c.) Release the ground cable using an appropriate Phillips screwdriver.
5.) The cable is released.
8-7-4-5 PSU to MPB DC Docking Cable Installation Procedure
1.) Connect the J8 and lower PSU connectors:
From the front end, position the cable connectors in the J8 and lower PSU connectors, ensuring
the orientation is appropriate, by checking the plastic marks are pointing to the correct direction.
Push the connectors' plastic hinges through the designated holes, until both hinges are fully
inside.
Connect the ground cable using an appropriate Phillips screwdriver.
2.) Perform Fan installation procedure.
3.) perform MPB installation procedure.
4.) Turn ON power to the system
Figure 8-137 Releasing the Ground Cable
Figure 8-138 Released Cable
MPB Fan Installation Procedure
MPB Module Installation Procedure
Perform the checks listed in ON/OFF Switch Cable Replacement Procedure on page 8-218