EasyManua.ls Logo

GE Venue R2

GE Venue R2
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 8 - Replacement Procedures 8-141
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-7-6-5 ON/OFF Switch Cable Installation Procedure
1.) Connect the ON/OFF Switch cable connector to the MPB J10 connector.
2.) Connect the other ON/OFF Switch cable connector to the MPB module by pressing the securing
clips on both sides of the connector.
3.) Install the MPB module and tighten the two mounting screws.
4.) Install the battery pack units.
5.) Refit the following covers: Lower Front eTower, left side eTower, Right side eTower and RS Probe
cover.
6.) Install all accessories.
7.) Turn ON power to the system.
Battery Module Installation Procedure
Left Side eTower Cover Installation Procedure
Right Side eTower Cover Installation Procedure
Lower Front eTower Cover Installation Procedure
RS Probe Cover Installation Procedure
Accessories - Replacement Procedures
Perform the checks listed in ON/OFF Switch Cable Replacement Procedure on page 8-218

Table of Contents

Related product manuals