8-176 Section 8-8 - Peripherals Replacement/Installation Procedures
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
11.)Mount the ECG module and tighten the screw to fix the ECG module in place.
12.)Install the following covers: MPB Front Metal Door, Upper Front eTower, Lower Front eTower with
cutout for ECG.
Figure 8-192 Fixing ECG Module
• MPB Front Metal Door Installation Procedure
• Lower Front eTower Cover Installation Procedure
• Upper eTower Front Cover Installation Procedure