66
Dimension 200
Preliminary Preparation
Before preparing the Dimension 200 for operation, complete the
following steps:
1.
Turn OFF the electrical box power switch.
2.
Unplug the router motor power cable.
3.
Raise the router motor by manually turning the Z axis
adjustment knob, located on top of the Z axis motor.
4.
Adjust the feet of the Dimension 200 to a higher or lower
position to ensure that the router table is level.