EasyManua.ls Logo

Gerber Dimension 200 - Router Package Contents

Default Icon
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Router Requirements 7
Router Package Contents
Contents of the large shipping crate for the Dimension 200 are
listed below. Check each part against the list and inspect all parts
for any damage which may have occurred during shipping.
WARNING
: Do not attempt to assemble and install the
Dimension 200 without adequate assistance. Though small, the
router table is heavy. At least four people are needed to move
the Dimension 200.
caution: BE EXTREMELY CAREFUL WHEN UNPACKING
THE DIMENSION 200 SO AS NOT TO DAMAGE THE
EQUIPMENT.
Crate:
1 ADVANTAGE Router Control (ARC) Station
1 Electrical Box
1 Dimension 200 Router Table
1 Table Stand Kit
1 Small components box
1 Mist Coolant System (optional)
1 Engraver System (optional for the Dimension 200, standard
for the Dimension 200E)
1 Engraver Vacuum System (optional for the Dimension 200,
standard for the Dimension 200E)
1 8' x 2 1/2" diameter Chip Removal System hose
1 20' braided copper ground strap (may be assembled inside the
Chip Removal System vacuum hose)
1 7' x 2" diameter hose for the T-Vac Vacuum System (optional)
1 T-Vac filter and blower fitting (optional)
2 Hose clamps (optional)
1 Training video
1 ADA material sample
1 Tool Kit

Table of Contents