© Guldmann GB/US-09/2016 • #550376_3
115
SERVICE AND REPAIR
Installation of cover kit 2
Important
When installation PCB and cables etc. protection against
static electricity must be used.
Remove the screws holding the old top cover.
Remove the cover
Install the two cable grommets.
Install the strain relief with the two M3 screws.
Pull the cables from the transformer through the cable
grommets and reconnect them to the PC board according
to the electrical diagram (page 155).
Switch track GH