EasyManua.ls Logo

Guldmann GH - Coating at GH1;GH3 During Annual Inspection

Guldmann GH
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Guldmann GB/US-09/2016 • #550376_3
41
SERVICE AND REPAIR
All PCB’s, plugs and switches must be coated during
service inspection..
The white circles at the pictures indicate where it is allowed
to spray coating.
Remember to coat both sides at the PCB’s.
NOTICE: Lifting strap, strap guide and emergency stop
may not be coated.
It is only NON UL hoists which may be coated.
IR PCB must also be coated, but avoid to spay at the
transparent part.
All plugs must be coated.
Charger PCB must also be coated.
Quality inspection:
Be sure that the all PCB’s, plugs and switches are coated
with an evenly distributed layer of coating.
GH3
Coating at GH1/GH3 during annual inspection

Table of Contents

Related product manuals