EasyManua.ls Logo

HALE SmartFOAM - Installation and Delivery Checklist; Installation; Delivery

Default Icon
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 75
SmartFOAM
INSTALLATION AND DELIVERY CHECKLIST
After the Hale SmartFOAM system is installed, use the following check list to verify installation and ensure proper system
setup when the apparatus is delivered to the end user.
INSTALLATION
Date
Initials
Checklist item
System properly installed. (“Start-Up Check List”)
Tank level sensor function verified. (“System Installer Start-Up”)
Foam pump operation checked. (“System Installer Start-Up”)
Foam tank and hoses drained of water. (“System Installer Start-Up”)
Flow sensor function checked and calibrated. (“User Calibration”)
DELIVERY
Date
Initials
Checklist item
Foam tank filled with user specified foam concentrate. (Complies with Hale ap-
proved concentrate compatibility list.)
Foam pump priming checked.
Water flow sensor calibration verified with Pitot and smooth bore nozzle.
Default simulated water flow value set to end user specification.
Foam preset text and injection rates set to end user specification.
Foam concentrate feedback value verified and calibrated with end user specified
foam.
Proper Hale SmartFOAM system operation demonstrated to end user in accordance
with manual procedures.
End user trained in proper operation of Hale SmartFOAM system in accordance with
manual procedures.
Warranty registration card filled out by end user and mailed to Hale Products.
Two copies of Description, Installation, and Operation manual provided to end user.

Table of Contents

Related product manuals