129
6-04 Cleaning
Burn out before
emptying grate
( 15) 15m
• Tip grate
Length of burning out phase prior to grate emptying.
(0 - 200 h)
6-05 Cleaning
Time
tipping up
( 150) 150s
• Tip grate
Preset duration of the tipping up of the grate (from the
horizontal to the vertical).
(0 - 300 s)
6-06 Cleaning
Time
duration
( 420) 420s
• Tip grate
Total time of the grate emptying procedure.
(0 - 900 s)
6-07 Cleaning
Monitor
tipping up
( 40) 40s
• Tip grate
After the set time has elapsed, the grate should be off the
monitoring limit switch.
(0 - 300 s)
6-08 Cleaning
Monitor
tipping down
( 240) 240s
• Tip grate
After the set time has elapsed, the monitoring limit switch
should not yet be triggered.
(0 - 900 s)
6-09 Cleaning
Ash auger
impulse time
( 100) 100s
• Ash auger impulse
Running time of the ash auger when grate emptying is
activated.
(0 - 999 s)
6-10 Cleaning preselection
None
Manual
Automatic
• Setting of the cleaning system
6-11 Cleaning system
Off
On
• Cleaning system
Switch automatic cleaning of the heat exchanger surfaces
on or off.
6-12 Cleaning
Cleaning after
operating hours
( 24) 24h
• Cleaning system
Number of operating hours after which the cleaning func-
tion switches on during continuous operation of the sys-
tem.
(0 - 100 h)
6-14 Cleaning
Number of
cleaning cycles
( 5) 5
• Cleaning system
Number of up and down movements of the automatic
cleaning system.
(1 - 250)
No. Display Description
Table 6/8 - System level / 6 - Cleaning