Contents
Preliminary information ----------------------6
Safety information ----------------------------- 6
Pre-visit checks ------------------------------- 6
Pre-commissioning ----------------------------- 6
Points to remember ----------------------------- 7
A typical commissioning process------------------8
Product Approval and Standards ------------------11
Fire detection and alarm control panel --------------------11
Interface Units ------------------------------- 11
Manual Call points ----------------------------- 11
S-Cubed Mark 3 ------------------------------ 12
S-Quad Sensors with Visual alarm device (VAD) - introduced post April 2014 - 13
S-Quad Sensors (Legacy product range) ------------------- 15
S-Cubed Mark 2 (Legacy product range)-------------------16
Fire Panels ----------------------------17
Vigilon 4/6 loop panels (EN/BS) ----------------------- 17
Vigilon Compact Panel (EN) ------------------------ 17
Vigilon Compact VA panel (EN) (Legacy panel) ---------------17
Controls and indications ----------------------18
Vigilon 4/6 loop Panels ----------------------23
Second fix parts------------------------------- 23
Remove the protective covers ------------------------ 23
Fitting the inner door ---------------------------- 24
Printer paper roll ------------------------------ 25
Setting the DKC card ---------------------------- 26
Card installation ------------------------------ 27
Terminals on Terminal Card -------------------------28
Pre power-up checks ---------------------------- 29
Mains supply wiring ---------------------------- 29
Battery installation ----------------------------- 30
PSU LED indications ---------------------------- 31
Write protect link on backplane ----------------------- 31
Fire Routing LEDs (Post Mid 2015) --------------------- 32
Command Build LEDs CB253 and CB254 (Pre Mid 2015) ----------32
How to configure the 'U' buttons -----------------------33
Factory settings ------------------------------- 33
How to fit the outer door -------------------------- 33
Vigilon Compact Panel ----------------------34
Cards and internal cables of the panel -------------------- 35
Installing a replacement MCB in an older Vigilon Compact panel -------36
Terminals on the Master Control Board (MCB) ----------------37
Settings on the DKC ---------------------------- 38
Pre Power up checks ---------------------------- 39
Battery Installation ----------------------------- 39
Mains supply -------------------------------- 40
How to configure the monitored input --------------------41
Fire Routing LEDs (post mid 2015) ---------------------42
How to configure the LEDs CB253 and CB254 (pre mid 2015) --------42
How to configure the U1 and U2 buttons -------------------43
External printer ------------------------------- 43
Factory settings ------------------------------- 44
Vigilon Compact Voice Alarm Panel - (legacy product) -------45
Cards and internal cables of the panel -------------------- 46
Terminals on the Audio Control Card --------------------47
Terminals on the Master Control Board--------------------48
Pre power up checks ---------------------------- 48
Battery Installation ----------------------------- 49
Mains supply -------------------------------- 50
External printer ------------------------------- 50
How to configure the monitored input --------------------50
How to configure the buttons U1 and U2 -------------------50
How to configure LEDs CB253 and CB254 (Legacy) -------------50
How to check and set the audio signal --------------------51
Factory settings ------------------------------- 51
Indications on power up ----------------------52
Initial tests ----------------------------52
Useful menu options -----------------------53
Panel Buzzer -------------------------------- 53
Software version check --------------------------- 53
Commissioning instructions
2 4188-856_issue 7_07/15_Generic Vigilon (Compact + VA) Comms.
Contents