FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Copyright © Huawei Technologies Co., Ltd.
Figure 3-36 Installing guide rails
Step 3 Engage floating nuts into appropriate positions on the cabinet column using a floating nut
mounting bar or a flat-head screwdriver, as shown in Figure 3-37. Install two floating nuts on
each side, as shown in Figure 3-38.
Figure 3-37 Floating nut installation positions